Sandvik Mining and Rock Technology signed a strategic framework agreement with Resolute Mining Ltd. to fully automate the latter’s Syama gold mine in Mali, Africa. Sandvik will deliver the AutoMine and OptiMine systems for analysis, process optimization and automation, as well as a full fleet of TH663 trucks and LH514E electrical loaders. The system will be commissioned in late 2018. The underground mine, co-designed with Sandvik, extends the operation, commissioned in 2009, to beyond 2028.
Read the Whole Article in our Digital Edition

Share