Denison Mines has reported the results of the prefeasibility (PFS) of its flagship Wheeler River uranium project at the eastern end of the Athabaska Basin in northern Saskatchewan. The PFS supports development of two mines on the property, an in-situ recovery (ISR) mine on the Phoenix deposit and an underground mine utilizing conventional longhole stoping on the Gryphon deposit.
Read the Whole Article in our Digital Edition

Share