Rail-Veyor Technologies Global Inc. announced its Rail-Veyor system hauls all production material at Agnico Eagle Mines Ltd.’s Goldex mine in Val-d’Or, Quebec, Canada, for their Deep 1 project. Installation of the 3-km underground system began as part of Goldex’s new Deep 1 project, which launched in July 2017. The Rail-Veyor system was installed to haul material at lower operational costs than other alternatives, such as trucks or conveyors, Rail Veyor Technologies reported. As mine production ramps up, a total of six Rail-Veyor trains are used in a fully automated and synchronized operation.
Read the Whole Article in our Digital Edition

Share