EMJ Calendar
- Economic & Evaluation Investment Decision Methods (05-14)
- Future Mongolia (05-16)
- ALTA Nickel-Cobalt-Copper, Uranium & Gold Conference (05-26)
- M&T Expo 2012 (05-29)
- AIMS 2012 7th International Symposium “Rockbolting and Rock Mech (05-30)
- Western Mining Electrical Association Bi-annual Meeting (05-30)
- 27th Annual Mining Expo (06-04)
- Show more...
Weekly News Service
E&MJ is proud to offer its weekly news service for our loyal readers. Sign up for our Email Newsletter to keep up-to-date with the latest news the mining industry has to offer. Or, simply text ENGINEERING to 22828 to get started!
| Osisko Mining increased total inferred resource estimate |
|
|
|
| Tuesday, 10 January 2012 11:38 |
|
Osisko Mining has increased the total inferred resource estimate for its Hammond Reef gold project near Atikokan, Ontario, to 10.52 million oz of gold based on a 0.30 g/mt gold lower cut-off. Osisko gained the project when it acquired Brett Resources for about C$372 million in 2010. The new estimate is based on about 300,000 m of drilling by Brett and Osisko from January 2010 to July 2011. Osisko anticipates that drilling of an additional 130,000 m by February 2012 will allow the in-pit deposit to be upgraded to measured and indicated during the first quarter of 2012. The in-pit inferred resource currently stands at 6.86 million oz at a diluted grade of 0.63 g/mt gold, based on a Whittle-optimized pit shell using a gold price of $1,200/oz, a corresponding lower cut-off grade of 0.28 g/mt gold, and a waste:ore strip ratio of 1.25:1. This represents an increase of 1.36 million oz of gold above a previous resource estimate in 2009. The Whittle shell has approximate maximum dimensions of 2,500 m in length, 1,050 m in width, and 380 m in vertical depth. Osisko expects to release a further resource update for the Hammond Reef project at the end of the first quarter of 2012, with a feasibility study to follow. (www.osisko.com) |




