Osisko Mining reports that new drilling at its Upper Beaver gold project in Kirkland Lake, Ontario, has led to the discovery of two new gold-copper zones. Osisko acquired the Upper Beaver project when in acquired Queenston mining in a transaction that was completed in December 2012.

Step-out exploration drilling in the first quarter of 2013 intersected the two new discoveries, the East Basalt zone and the North Q zone, both occurring in mafic volcanic rocks adjacent to the Upper Beaver igneous complex.

Four holes drilled in the East Basalt zone approximately 700 m north-east of the established Upper Beaver deposit intersected new copper-gold mineralization starting at 75 m below surface. The most significant result was from a hole that intersected an 18.1-m-thick continuous zone of gold and copper mineralization that assayed 9.3 g/mt gold and 1.7% copper, including an 11.1-m interval assaying 13.1 g/mt gold and 2.8% copper.

In the North Q zone approximately 400 m northwest of the Upper Beaver deposit, two holes intersected multiple stringers of gold and copper mineralization approximately 200 m below surface. Significant intervals included 8 m of 3.2 g/mt gold and 0.6% copper, including 2 m of 11 g/mt gold and 1.6% copper; and 14 m of 1.84 g/mt gold and 0.3% copper, including 4 m of 4.4 g/mt gold and 0.75% copper over 4 m.

Osisko’s focus at Upper Beaver for 2013–2014 will be on the development of the 1,300-m exploration shaft, including engineering, design, and fabrication of the head frame and hoisting facilities budgeted at $70 million. The shaft collar has been established to a depth of 26 m, and exploration on the deposit continues with six drills.
(www.osisko.com)

Resource Center Whitepapers, Videos, Case Studies

Let's stay in touch!

All of the latest mining news and our digital edition sent to your inbox once a week.

We'll never share your email address, and you can opt out at any time, we promise.